MCQOPTIONS
Saved Bookmarks
| 1. |
Cost estimates are evaluated with respect to actual cost incurred in process of |
| A. | Performance Evaluation |
| B. | Cost Analysis |
| C. | Break Even point |
| D. | Failure rate |
| Answer» C. Break Even point | |