

MCQOPTIONS
Saved Bookmarks
1. |
Arrange the following to obtain the correct procedure of sand replacement method.I. Measurement of soil densityII. Determination of water content and dry densityIII. Calibration of the cylinder |
A. | (I), (II), (III) |
B. | (III), (II), (I) |
C. | (III), (I), (II) |
D. | (I), (III), (II) |
Answer» D. (I), (III), (II) | |