

MCQOPTIONS
Saved Bookmarks
1. |
An ungated spillway starts functioning as soon as the water level in the reservoir crosses the __________________ |
A. | maximum reservoir level |
B. | minimum reservoir level |
C. | maximum conservation level |
D. | full Supply level |
Answer» D. full Supply level | |