Concrete Technology
→
Flexural Strength Concrete
→
After placing each layer in a slump cone, the conc...
1.
After placing each layer in a slump cone, the concrete in the cone is tapped to remove remaining voids.
A.
True
B.
False
Answer» B. False
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Which apparatus is generally used to measure the soundness of the cement?
What is the amount of water required to give the paste normal consistency for consistency test?
The apparatus used are ___ IS Sieve, Balance capable of weighing 10g to the nearest 10mg.
If L1=Measurement taken after 24 hours of immersion in water at a temp. of 27 ± 20oC and L2=Measurement taken after 3 hours of immersion in water at boiling temperature. Then what is soundness of cement?
WHAT_IS_THE_AMOUNT_OF_WATER_REQUIRED_TO_GIVE_THE_PASTE_NORMAL_CONSISTENCY_FOR_CONSISTENCY_TEST??$
Which_apparatus_is_generally_used_to_measure_the_soundness_of_the_cement?$
The apparatus used are ___ IS Sieve, Balance capable of weighing 10g to the nearest 10mg?
To determine the fineness of cement ____
If L1=Measurement taken after 24 hours of immersion in water at a temp. of 27 ± 20oC and L2=Measurement taken after 3 hours of immersion in water at boiling temperature. Then what is soundness of cement?$
In the soundness test a specimen of hardened cement paste is ___ for a fixed time.