1.

A surface water treatment plant operates round the clock with a flow rate of 35 m /min. The water temperature is 15 C and jar testing indicated an alum dosage of 25 mg/l with flocculation at a Gt value of 4 104 producing optimal results. The alum quantity required for 30 days (in kg) of operation of the plant is __________

A. 37800 kg
B. 35600 kg
C. 32800 kg
D. 3240 kg
Answer» B. 35600 kg


Discussion

No Comment Found

Related MCQs