1.

A site has a unidirectional slope of 30 with horizontal along its longer side. The projected dimensions of the site on the horizontal plane measures 30 m 40 m. Using cut and fill method the site has to be levelled parallel to the horizontal plane. The minimum amount of earth to be excavated in cubic metre is ____________

A. 463 to 546
B. 3463 to 3465
C. 3433 to 3665
D. 3461
Answer» C. 3433 to 3665