MCQOPTIONS
Bookmark
Saved Bookmarks
→
Environmental Engineering
→
Oxidation Stabilization Ponds
→
A pipe installed for ventilation purpose is called
1.
A pipe installed for ventilation purpose is called
A.
waste pipe
B.
soil pipe
C.
vent pipe
D.
anti-siphonage pipe
Answer» D. anti-siphonage pipe
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
For a circular sewer running partially full, the proportionate wetted perimeter is given by:
Anti siphonage pipe is fitted:
Maximum discharge through a circular channel takes place when depth of flow is equal to
A sewer which receives storm water, surface runoff and sewage is called a/an
A pipe conveying domestic wastewater from plumbing fixtures of a single building to a common sewer or point of immediate disposal is known as
__________ are used for the pipes laid in rivers with uneven bed.
Intercepting traps are often provided at the junction of:
In sanitation Man-hole is apparatus for ______
A combined sewerage system is more appropriate for developed areas where
Hydraulically for dry weather flow, the best sewer section is
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies