A manufacturing plant, working in 2 shifts of 8 hrs each, produces 30,000 switch boards using a set of 7 workstations in series. The cycle time, in seconds, is |
A. | 1.1 to 1.4 |
B. | 1.5 to 1.8 |
C. | 1.9 to 2 |
D. | 2.1 to 2.4 |
Answer» D. 2.1 to 2.4 | |