1.

A hemispherical earth mound of 3 meter diameter is proposed to be constructed in a children s park. If the proportion of soil and sand for the construction is 3:2, the estimated volume of soil in cubic meters is ________

A. 6.15 to 8.30
B. 3.15 to 4.30
C. 4 to 5
D. 4.15 to 4.30
Answer» E.


Discussion

No Comment Found