MCQOPTIONS
Saved Bookmarks
| 1. |
A hemispherical earth mound of 3 meter diameter is proposed to be constructed in a children s park. If the proportion of soil and sand for the construction is 3:2, the estimated volume of soil in cubic meters is ________ |
| A. | 6.15 to 8.30 |
| B. | 3.15 to 4.30 |
| C. | 4 to 5 |
| D. | 4.15 to 4.30 |
| Answer» E. | |