1.

A group of 200 men did 5/6th of work in 10 weeks. Due to COVID lockdown work was stopped for 6 weeks. Due to the flood half of the work done was wasted and after lockdown, only 140 men came. Then find the total time taken by the contractor to complete the whole work?

A. 22 weeks
B. 28 weeks
C. 26 weeks
D. 32 weeks
Answer» D. 32 weeks