1. |
A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in: |
A. | 9 1/5 days |
B. | 9 2/5 days |
C. | 9 3/5 days |
D. | 10 days |
Answer» E. | |