1.

A can do a piece of work in x days, B can take 10 more days than A to complete the same work, and C can do the same work alone in 10 days. If A, B, and C together can do 50% of the total work in \(2\frac{{13}}{{31}}\) days, then find the value of x.

A. 12 days
B. 10 days
C. 15 days
D. 18 days
E. 9 days
Answer» D. 18 days