MCQOPTIONS
Saved Bookmarks
| 1. |
A can complete a piece of work alone in x days but B takes (2x – 4) days to complete the same piece of work. If the efficiency of B is 40% less than that of A, then in how many days A and B together can complete the piece of work? |
| A. | 6 days |
| B. | 8 days |
| C. | 7.5 days |
| D. | 12.5 days |
| E. | None of these |
| Answer» D. 12.5 days | |