A, B and C can complete a work in 10, 12 and 15 days respectively. A left the work 5 days before the work was completed and B left 2 days after A had left. Number of days required to complete the whole work is : |
A. | |
B. | |
C. | 7 |
D. | 6 |
Answer» D. 6 | |