| 1. |
A, B and C can complete a piece of work in 10, 12 and 15 days respectively. A left the work 5 days before the work was completed and B left 2 days after A had left. Number of days required to complete the whole work was ? |
| A. | days |
| B. | days |
| C. | days |
| D. | days |
| Answer» E. | |