MCQOPTIONS
Saved Bookmarks
| 1. |
A and B together can do a work in 10 days. B and C together can do the same work in 6 days. A and C together can do the work in 12 days. Then A, B and C to¬gether can do the work in |
| A. | 28 days |
| B. | 14 days |
| C. | 5 5/7 days |
| D. | 8 2/7 days |
| Answer» D. 8 2/7 days | |