1.

A and B can do a work in 12 days, B and C can do the same work in 15 days, and C and A can do the same work in 20 days. A, B and C will complete the work together in:

A. 20 days
B. 28 days
C. 12 days
D. 10 days
E. None of these
Answer» E. None of these