A and B can do a piece of work in 12 days; B and C can do it in 15 days and C and A can do it in 20 days. A alone can do the work in: |
A. | 30 days |
B. | 29 days |
C. | 28 days |
D. | 27 days |
Answer» B. 29 days | |