A and B can do a job together in 7 days. A is 13/4 times as efficient as B. The same job can be done by A alone in |
A. | (A's 1 day's work) : (B's 1 day's work) = 7/4 : 1 = 7 : 4. |
B. | Let A's and B's 1 day's work be 7x and 4x respectively. |
C. | Then, 7x + 4x = 1/7 => 11x = 1/7 => x = 1/77 . |
D. | Therefore A's 1 day's work = ( 1/77 x 7 ) = 1/11 = 11 days |
Answer» B. Let A's and B's 1 day's work be 7x and 4x respectively. | |