1. |
A and B can do a job in 10 days and 5 days, respectively. They worked together for two days, after which B was replaced by C and the work was finished in the next three days. How long will C alone take to finish 60% of the job? |
A. | 18 days |
B. | 30 days |
C. | 25 days |
D. | 24 days |
Answer» B. 30 days | |