1.

A 4 m diameter tunnel has been constructed through an earthen dam with a bell mouth entry. The water levels on the U/s and D/s sides of the dam are at RL 226 m and 210 m respectively. What will be the discharge through this outlet?

A. 64 cumecs
B. 104 cumecs
C. 165 cumecs
D. 216 cumecs
Answer» D. 216 cumecs